- Open the Bill of Materials window in one of the following ways:
- On the ribbon, from the group on the tab, click Bill of Materials.
- In classic view, click Database menu > Bill of Materials.
- Expand the Database Items list as needed and select one or more items to assign to the same material class.
- You can sort the item list in a different order.
- You can arrange a list in a different order by choosing one of the sort options available.
Before you begin
Open the List window if you have not already done so.
To open a list, use one of the following methods:
To sort a list of entries:
-
(optional) Select the source option to display a list of entries from either the current estimate or standard database.
-
Use one of the following methods to select the sort option that is most useful to you.
Note: Not every List window has both options.
- Select your option from the Sort Item List By drop-down list.
- Right-click the item list area, and then choose your sort option from the Sort Item List By list.
- Typical sorting options include Description and Phase/Item. You can also set up your own item sort sequences.
- If necessary, press [¬] to collapse a list or [®] to expand a list.
Do you have linked item prices in your standard database? To assign linked items to the same material class as the selected items, select the Assign linked items check box.
- Drag the selected items and drop them on the desired material class ( ) in the Material Classes list. Do you need a material class that has not been set up yet? Click [Add] and enter the information for the new material class. Sage Estimating creates a bill of materials (BOM) description folder () for the items (). It uses the description of the first selected item for the BOM description.
To display help for a list, click on the window and then click the list.
- Customize the bill of materials as needed.
To customize a bill of materials, you can:
- Change the BOM description for an item.
- Change the order of the BOM descriptions.
- Move an item to a different material class.
- Move an item to a different BOM description.
- Remove an item from the bill of materials.
- When you finish setting up your bill of materials, click [Close].