Summary
How to move job costs from one job to another in Sage 100 Contractor.
Resolution
Adjusting job cost with 1-3 Journal Transactions
- Open 1-3 Journal Transactions.
- In the header area, enter the following information.
- In the Trans# box, enter a transaction number
- In the Date box, enter the effective date
- In the Description box, enter a brief statement
- Leave the grid area blank
- Verify that the posting period is correct
- From the menu bar, select Costs and Job Costs.
- On the first blank line of the grid, enter the following.
- In the Job box, enter the original job
- In the Description box, enter a brief statement
- In the Cost Code box, enter the original cost code
- In the Cost Type box, enter the original cost type
- In the Cost box, type the cost as a negative amount
- On the next blank line of the grid, enter the following.
- In the Job box, enter the new job
- In the Description box, enter a brief statement
- To add job costs to a job phase, enter the job phase number in the Phase box
- In the Cost Code box, enter the correct cost code
- In the Cost Type box, enter the correct cost type
- In the Cost box, type the cost as a positive amount
- Repeat Steps 4 and 5 for each job posted in error.
- In the footer area, blank Ledger Total and Job Cost Total boxes when entering positive and negative lines.
- Click File and Save.
Adjusting Job Cost for Payroll
- Locate the original incorrect job cost using the record number and display in 6-3 Job Costs.
- Select Edit and Copy Cost Record.
- Select File, New,
- Click Edit and Paste Cost Record.
- Change the Cost Amount, Employee Hours, and Gross Wage to a negative.
- Select Time and Materials Billing and change the Status to 2-Not Billable on the original and reversal.
- Select File and Save.
- Select File, Recall, and follow Step 2.
- Correct the Job and change the negative to a positive.
- Select File and Save.
Adjusting cost code on job cost:
- Open 6-3 Job costs and select the record that needs to be changed
- On the cost code field, change to what it should be
- If necessary, do the same with cost type
- File, save
Need more help?