| Error: "A job cost interface failure occurred" |
Description | Cause - The link between Sage Estimating and Sage 300 CRE is corrupt
- A Standard Estimating database was integrated with the Pervasive version of Job Costs
- The link between Sage Estimating and Sage 100 Contractor is corrupt
- The version of Sage 100 Contractor isn't compatible with Sage Estimating
Solutions Sage 300 CRE and Sage Estimating integration Sage 100 Contractor and Sage Estimating integration [BCB:154:Chat 100 Contractor US:ECB] |
|