Summary
How do I add a cost code to a job in Sage 300 CRE Job Cost?
Resolution
- In Job Cost, go to Setup, Cost Codes.
- Enter the Job and the Extra (if used).
- With the cursor in the Cost Code field, enter the cost code or select it from the list.
- Use the Tab/Enter key past the description.
- Click Save.